Construction Management

/subjects/construction-management

Assignment Task : In 1993, Greg Lynn guest-edited an issue of Architectural Design dedicated to an emerging movement in architecture: folding. Lynn, a Los Angeles-based architect/educator with a background in philosophy and an attraction to comput …

  • Uploaded By : Grace
  • Posted on : July 18th, 2019
  • Downloads : 0
  • Subject Code :

    CME105

Assignment Task: Learning Outcomes addressed: This assessment addresses the following unit learning outcomes: 1. Interpret specifications and drawings for measuring simple construction works 2. Produce measurements for simple constructi …

  • Uploaded By : Mia
  • Posted on : July 11th, 2019
  • Downloads : 0
  • Internal Code :

    1CACAG

  • Country :

    Australia

Assignment Task : Assessment (Practical Tasks)  This assessment has three (3) parts. Parts 1, 2, and 3 require you to use the BCA to draft a range of reports relating to the ‘deemed to satisfy’ and performance requirements, as …

  • Uploaded By : Grace
  • Posted on : June 22nd, 2019
  • Downloads : 2
  • Internal Code :

    F_BJ_HFFA_BCF

  • Country :

    Australia

Assignment Task: Question:  Measure [i.e. take off] and prepare the Bill of Quantities for the following:  1. Stairs – there are two stairs in the drawing, measure them 2. Columns – measure for both floors 3. Beam …

  • Uploaded By : Mia
  • Posted on : June 12th, 2019
  • Downloads : 0
  • Internal Code :

    E_BJ_HCJI_FBA

  • Country :

    Australia

Assignment Task : Overview  The assignment contains two sections. Students are required to select ANY TWO questions from SECTION A (20 marks) and answer all questions in SECTION B (20 marks). The word limit for the assignment is 3000. Sugg …

  • Uploaded By : Grace
  • Posted on : May 27th, 2019
  • Downloads : 11

Assignment Task: Question:  Measure [i.e. take off] and prepare the Bill of Quantities for the following:  1. Stairs – there are two stairs in the drawing, measure them 2. Columns – measure for both floors 3. Beam …

  • Uploaded By : Mia
  • Posted on : May 15th, 2019
  • Downloads : 0

Assignment Task : Rationale: Across the international construction sector there continues to be momentum to transform. This is often driven by the Government’s commitment to facilitate digital information delivery enabled through Buildi …

  • Uploaded By : Grace
  • Posted on : May 04th, 2019
  • Downloads : 0

Assignment Task : CPCCBC5001B – Apply building codes and standards to the construction process for medium rise building projects Metharom Construction (MC) plans to become a leading provider of housing construction and renovation services i …

  • Uploaded By : Grace
  • Posted on : April 20th, 2019
  • Downloads : 0

Assignment Task   The Problem Scenario After graduating with a degree in construction management you then gain industry experience by working 4 years in a regional medium-sized building contractor specialising in medium density residentia …

  • Uploaded By : Brett
  • Posted on : April 12th, 2019
  • Downloads : 0
  • Internal Code :

    6DEGI

  • Subject Code :

    CPC40110

  • Country :

    Australia

Assignment Task : Introduction (CPC40110) Once you feel confident that you have covered the learning materials for this unit, you are ready to attempt this assessment. This assessment has been designed to allow you to provide partial evidence o …

  • Uploaded By : Grace
  • Posted on : February 27th, 2019
  • Downloads : 1
  • Subject Code :

    BLDG1004

Assessment Task: BLDG1004 Introduction to Management in Construction Assessment Answer Purpose of Assessment Item The purpose of this assessment is for you to engage in social constructivism. This requires you to form yourselves into a grou …

  • Uploaded By : Mitchell Lee
  • Posted on : December 09th, 2018
  • Downloads : 0
  • Subject Code :

    CPCCBC5010B

CPCCBC5010B - Construction OHS Management Plan Report - Construction Management Assessment Answer Assessment Task: Assessment Task: 2 Construction OHS Management Plan  Task Identify and visit a medium rise commercial building site in …

  • Uploaded By : Mitchell Lee
  • Posted on : November 15th, 2018
  • Downloads : 0
  • Subject Code :

    CPCCBC4011B

Assessment Task: CPCCBC4011B: Construction Management Assessment Answer Part A: - Compulsory Footing system - compulsory  Investigate and describe the soil type/foundation typical of the area  Detail the footing system t …

  • Uploaded By : Noah
  • Posted on : November 13th, 2018
  • Downloads : 0
  • Subject Code :

    CPCCBC4011B

Assessment Task: CPCCBC4011B Construction Management Assessment Answer To complete this assignment you will need to find a reinforced concrete or reinforced concrete/masonry framed building of commercial low rise form of construction, either un …

  • Uploaded By : Mitchell Lee
  • Posted on : November 12th, 2018
  • Downloads : 0
  • Internal Code :

    1BCHBG

U30169 - Methodology - Project Progress - Critically Analyse - Construction Management Assessment Answer Assessment Task:   Objectives:  To examine and analyse a problem  To plan and execute an independent investigatio …

  • Uploaded By : ethan
  • Posted on : November 06th, 2018
  • Downloads : 0

S3599000 - Modular Construction - Data Supporting - Research - Construction Management Assessment Answer Assessment Task: Introduction  Research Introduction and Background The construction industry is a large and thriving industry, …

  • Uploaded By : ethan
  • Posted on : November 04th, 2018
  • Downloads : 0
  • Subject Code :

    200470

200470 Construction Technology - Construction Management Assessment Answer Assessment Task: Students are to work in groups of 5 or less and report on a structure where the dominant structural material is structural steel. The following are a fe …

  • Uploaded By : Mitchell Lee
  • Posted on : October 30th, 2018
  • Downloads : 0
  • Internal Code :

    1BIGEI

  • Country :

    Australia

BUIL1027 Management Assessment Task The purpose of this assessment is to develop core academic and professional capabilities for both professional and academic reading and writing. Reading is integral to communication and learning, especially i …

  • Uploaded By : Keith
  • Posted on : October 19th, 2018
  • Downloads : 1
  • Internal Code :

    G_AI_EACD_CC

  • Country :

    Australia

CPC50210,  Structural Principles,  Unit Of Competency, Construction Management,  Assessment Answer   Assessment Task:         This Construction Management Asse …

  • Uploaded By : ethan
  • Posted on : October 19th, 2018
  • Downloads : 1
  • Internal Code :

    AJ_AI_EIBC_H

  • Subject Code :

    BBE203

  • Country :

    Australia

BBE203: Managing Multiple Projects Construction Management Report Writing Assignment Help  Assignment Task: Overview BBE203: You and your business partner have just formed a new construction company, and have successfully tendered …

  • Uploaded By : Noah
  • Posted on : October 03rd, 2018
  • Downloads : 0

Assignment Task:   Task:   Introduction This report highlights technical considerations that developers must consider during the development of 179-183 Hindley street, Adelaide SA 5000. This report has information from two pr …

  • Uploaded By : Pearl
  • Posted on : September 29th, 2018
  • Downloads : 0

Assignment Task: This Construction Management Assignment has been solved by our Construction Management Experts at TVAssignmentHelp. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are servin …

  • Uploaded By : Mia
  • Posted on : September 19th, 2018
  • Downloads : 0

BBE301 Medium Density Sub-Division and  Development  Assessment Answer Assessment Task: About the Project: Development Victoria has acquired a 19.2ha development site in Knoxfield located at the corner of Burwood Highway …

  • Uploaded By : Noah
  • Posted on : September 09th, 2018
  • Downloads : 1
  • Internal Code :

    1CCBHA

  • Subject Code :

    CPCCBC4003A

  • Country :

    Australia

ASSIGNMENT TASK:   TASK: Part 1 – Prepare a contract and all supporting documentation for a residential Project Part 1 requires you to select the building contract that is appropriate for the residential project provided. You a …

  • Uploaded By : Pearl
  • Posted on : September 08th, 2018
  • Downloads : 0
  • Internal Code :

    H_AI_EDAA_AID

  • Subject Code :

    BBE303

  • Country :

    Australia

BBE303 - High Rise Development & Procurement Methods Asseemsnet Answer Assessment Task: Assignment 1 – Project Technical Report  The first part of the assignment is to convince the client of your construction knowledge. F …

  • Uploaded By : Clay
  • Posted on : August 21st, 2018
  • Downloads : 0
  • Internal Code :

    G_BJ_IADB_AFC

  • Country :

    Canada

Assignment Task : PROJECT SCOPE Development of additional border capacity for Detroit-Windsor is a key priority for U.S. and Canadian governments, as well as private industries, shippers and manufacturers on both sides of the border. New b …

  • Uploaded By : Grace
  • Posted on : July 20th, 2018
  • Downloads : 0

Can't find what you're looking for?

Why are you waiting for Assignment Deadline?
Book Assignment Today & Get 500 Words Free
Order Now TnC Apply
cancel

Choose a Plan

Premium

USD
  • All in Gold, plus:
  • 30-minute live one-to-one session with an expert
    • Understanding Marking Rubric
    • Understanding task requirements
    • Structuring & Formatting
    • Referencing & Citing
Most
Popular

Gold

30 USD
  • Get the Full Used Solution
    (Solution is already submitted and 100% plagiarised.
    Can only be used for reference purposes)
Save 33%

Silver

USD
  • Journals
  • Peer-Reviewed Articles
  • Books
  • Various other Data Sources – ProQuest, Informit, Scopus, Academic Search Complete, EBSCO, Exerpta Medica Database, and more