CASE 1. (RSK80004)

Give an opinion as to whether or not the employer in the following example would be considered negligent in providing a “safe place and/or system of work”. 

This is a real case DIRECTOR OF PUBLIC PROSECUTIONS v Evergreen Civil Pty Ltd 

 

Outcome: Evergreen Civil Pty Ltd (the offender) is a construction company specializing in public landscapes, streetscapes, drainage, and civil infrastructure. They were undertaking works at Tunstall Square Shopping Centre, Beverley Street, Doncaster East (the workplace). 

On 1 June 2017 at 10:15 pm, a pedestrian received serious injuries after falling over 1 meter to the bottom of an open stormwater excavation next to a footpath. The fencing around the perimeter of the open excavation included star pickets and orange para- webbing. Members of Victoria Police witnessed the incident and assisted the injured person at the scene. 

WorkSafe was notified by Victoria Police on 2 June 2017, and on 5 June 2017, the WorkSafe Inspector attended the workplace. He observed safety measures to the site had been undertaken, including crowd control barriers Dyna-bolted to the footpath. No notices were issued. 

The offender had a Safe Work Method Statement providing that work areas were to be isolated by the use of signage, bollards, bunting and fencing. The para-webbing had been installed by the site foreman and checked on a daily basis by the site supervisor. 

The offender pleaded guilty to a single charge under s. 23(1) on the basis that there was a risk of serious injury or death, and it was reasonably practicable to secure the site to ensure public safety, by installing and securing temporary perimeter fencing or isolating persons from the hazard or a combination of both. 

The offender pleaded guilty and was without conviction sentenced to pay a fine of $20,000 and costs in the amount of $4,725. 

With a core team of experienced and knowledgeable staff, Evergreen Civil strives to achieve the perfect balance of time, cost and quality for each and every project. 

 

We do this by engaging our key fundamental principles: 

• We pay attention to your objectives 

• We pinpoint project challenges as early as possible and work with you to resolve them rather than use them as excuses 

• We maintain a team of people with varying skills which makes for a very efficient and competent project delivery team 

 

The type of works carried out by Evergreen Civil includes (but is not limited to) the construction and/or maintenance of: 

• Streetscapes and Landscapes 

• Stormwater Harvesting 

• Drainage and Civil Infrastructure 

• Bulk Earthworks 

• Environmental Construction 

• Paving and Stonemasonry 

 

CASE 2. (RSK80004)

Give an opinion as to whether or not the defendants in the following example would be considered negligent in their duty of care to road users and neighbors. 

This is a real case DIRECTOR OF PUBLIC PROSECUTIONS v AM DESIGN AND CONSTRUCTION PTY LTD & ALDO DITONTO: 

AM Design & Construction Pty Ltd (‘the offender’) completed structural drawings for the basement excavation works for a mixed commercial and residential development to be constructed at 170-174 Highbury Road, Mount Waverley (‘the workplace’). Aldo Di Tonto was the structural engineer for the development and was the secretary, sole director and sole owner of the offender. The structural drawings for the workplace did not require the concurrent installation of a site retention system. There was a risk to persons working inside, or working, residing or traveling in the vicinity of the excavation pit that, if the walls of the excavation collapsed, they could be seriously injured or killed by being engulfed in the collapse, or falling into the excavation pit. Sometime during the night of 13-14 July, 2015 part of the excavation collapsed in the south-east corner of the workplace. On the night of 15 July 2015 a further, and much larger, collapse occurred. The police advised the residents of the front townhouse to immediately evacuate.

 

This RSK80004 - Engineering Assignment has been solved by our Engineering Experts at onlineassignmentbank. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+ Students in Australia, UK & US by helping them to score HD in their academics. Our experts are well trained to follow all marking rubrics & referencing style.

Be it a used or new solution, the quality of the work submitted by our assignment experts remains unhampered. You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turnitin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.

  • Uploaded By : admin
  • Posted on : March 16th, 2019
  • Downloads : 17

Whatsapp Tap to ChatGet instant assistance