Assignment Task :

Learning Outcomes :

1 Demonstrate the ability to select and use sensors and transducers typically used in advanced engineering applications
2 Apply appropriate engineering analysis methods in practical aspects of sensor use
3 Collect and analyse research data and to use appropriate engineering analysis tools in tackling instrumentation and measurement systems
4 Use virtual instrumentation and virtual simulation tools to design and critically analyse applied instrumentation systems

 

Task:
‘Global-Technologies’, is a system engineering company that develops measurement systems for different industries to support a wide range of applications.
You have been asked as an engineer in the ‘Global- Technologies’ company, to design and develop a measurement system that is able to demonstrate the operation of crane 'Load Moment Indicator' (LMI) system using sensors model. The measurement system includes the measurement of crane boom length, boom angle, load, outrigger position, and driver cabinet temperature.
Provide a detailed, professional report for your director that contains the following:
1- A review of different LMI systems used in cranesindustry including their main elements.
2- A design of a typical LMI system that incorporates the measurement of crane parameters including boom length, boom angle, load, outriggers position, and temperature. The system design should include DAQ/ microcontroller and any other required elements for a typical LMI system.
3- A measurement software program (LabVIEW/ C++) that can be used to provide the following parameters, log the measurement data, and give warning alarms when limits of the following parameters are

  • Boom length
  • Outriggers position
  • Load
  •  Driver cabinet temperature

4- Experimental results and critical analysis that evaluate two sensors of the LMI system using the NI DAQ and NI LabVIEW software.
5- An evaluation of signal conditioning elements that are required to measure the load using strain gauges.
6- Proposal for the next phases of developmentto include the following:
A. Using of a low-cost controller instead of the current one
B. Other methods of data transmissions; wireless or wired data transmission, and use of the Internet of Things
 

 

This Engineering Assignment has been solved by our Engineering Experts at UniLearnO. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+ Students in Australia, UK & US by helping them to score HD in their academics. Our Experts are well trained to follow all marking rubrics & referencing style.Be it a used or new solution, the quality of the work submitted by our assignment experts remains unhampered. You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turnitin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.

Eureka! You've stumped our genius minds (for now)! This exciting new question has our experts buzzing with curiosity. We can't wait to craft a fresh solution just for you!

  • Uploaded By : Grace
  • Posted on : May 22nd, 2019

Whatsapp Tap to ChatGet instant assistance