University : Sydney City College of Management UniLearnO is not sponsored or endorsed by this college or university.
Subject Code : ICTNWK506
Country : Australia
Assignment Task -                 
 

Report/Project


Case Study
The regional electrical utility company, South West Electrical, needs a network to be designed and implemented.The company supplies electricity over a wide area. Its headquarters are in Exeter with a call-center in Plymouth connected via leased line.  The Engineering division operates out of Poole whilst the Sales team has a Sales Office in Bournemouth. The Bournemouth and Poole branches are connected to the company’s headquarters in Exeter using Frame Relay because of cost considerations.  The company’s networks communicate using the open standard routing protocol OSPF.The company wants to use private addresses throughout for security reasons and DHCP for the LANs.  Access to the Internet is provided from Exeter using network address translation.  

The company also wishes to limit Internet access to Web traffic while allowing multiple protocols within its own WAN. A set of servers are provided at the company’s headquarters in Exeter, although the Engineering division has its own server connected to its own network. Although private addresses will be used, the company appreciates efficiency and address conservation in design.
 

troubleshoot WAN

 


Requirements
The company has 6 departments / divisions – Personnel, Accounts, Engineering, Sales, Customer Services, and IT Support.  The offsite sales team is provided with wireless laptops for access to the sales network via the Bournemouth branch.  Your design must provide for 
4 employees in the Personnel department. 
5 employees in the Accounts department. 
30 employees in the Engineering division at Poole 
50 wired workstations for Customer Services at Plymouth. 
50 laptops for external mobile Sales staff for access via the Bournemouth office. 
5 employees (maximum) in IT Support with direct access at Exeter.
Lifetime max of two servers for Accounts and Personnel and two General Servers for all departments and divisions. 
Expect 100% growth of current IP requirements when determining the size of subnets. 
All networking devices must have IP addresses.
Use the private class B 172.20.0.0 network for internal addressing throughout the company’s WAN and LAN networks.
Use subnet 200.1.1.0/24 for connection to the Internet via the HQ router in Exeter. 
There is a DNS server at address 198.198.1.2/24 connected to the HQ router.
Security between the various networks is required to be controlled via firewalls (access control lists).
One public address, 199.199.199.1, has been provided external access to the Internet for the company. 


The report may have several parts.
Task 1
Students must consider a variety of factors when preparing the report. The report should start with an overview of:
Existing computing resources, operating system, and network setup.

Compatibility with the existing network, operating system, and software Specific requirements of client/business

Task 2
To prepare the report, you may review the existing network documentation and access the networking facility. Advise the organization what kind of documents are required and how do you plan to access them. You can also write an email to schedule an organisation tour to get an overview of the existing networking resources and to plan to the expansion process. Based on the review, provide a brief overview of how do you plan to access existing network facilities and plan further expansion.

Task 3
Identify the client’s requirements and select the hardware to implement the requirements or the WAN network in this case (including numbers of routers, switches, cables, or any other components) and software required to fulfill such requirements. Also, specify the specifications and features of hardware such as routers/switches you plan to use.
Task 4
Do you need to contact any vendors to procure such hardware and software? What are the licensing requirements of the software you are planning to use? Make a procurement plan confirming the organization’s procurement policies and contracting procedures.
Outline the technical specifications of the hardware? (will need to contact relevant vendors)
Discuss what configurations are required to adapt/optimize the hardware to the networked system.
Also, discuss how you are going to ensure that you maintain WHS codes, regulations, and standards while designing the network.
 

 

This ICTNWK506 - IT Assignment has been solved by our IT Experts at onlineassignmentbank. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+Students in Australia, UK & US by helping them to score HD in their academics. Our Experts are well trained to follow all marking rubrics & referencing style.

Be it a used or new solution, the quality of the work submitted by our assignment Experts remains unhampered. You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turnitin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.

  • Uploaded By : admin
  • Posted on : January 22nd, 2019
  • Downloads : 1

Whatsapp Tap to ChatGet instant assistance