1. Project Outline
‘Self Sufficient Lodge’ is an eco-friendly country lodge located on the Great Dividing Range north of the city of Toowoomba, where the owners Jura and Ima Green host immersion programs designed to teach their guests modern design principles for building sustainable housing and living a zero–impact lifestyle. The existing solar power generation system at the lodge is reaching the end of its life and the owners are looking to replace it with a new micro-hydro system, as outlined below.

1.1. The Proposed Micro-Hydro System
The objective is to generate and store electrical energy in the most efficient manner and in the most cost effective way. This is expected to be achieved by damming a creek to form a holding pond in which water will accumulate. Periodically a controllable flow rate of water is to be directed through a pipe to the turbine to generate electrical energy which is used to charge a bank of batteries. The energy stored in those batteries can then be used at any time to operate electrical devices on the
property.
It is proposed that the micro-hydro system be comprised of the following equipment:
- A concrete dam constructed across a valley where a creek currently flows
- Pipe work and nozzle to bring water to the turbine
- A Pelton Wheel turbine (not part of this assessment)
- An electrical generator (not part of this assessment)
- Battery Storage (not part of this assessment)
- Filter, enclosures and ancillary fittings (not part of this assessment)

2. Project Design Sections
The project will be divided into five design sections including a costing, to ensure that the requirements of the project are clear. Each section of the design is defined by the set of design parameters, listed in bold. Any company submitting a design proposal must use the given variable names (letters) for these parameters. Each design section requires a technical analysis which must be summarised in the final design proposal. The section numbers are:
1. Dam location and volume
2. Penstock (pressure pipe) and flow rate
3. Turbine and generator selection (not part of this assessment)
4. Battery selection (not part of this assessment)
5. Project costing (not part of this assessment)

 

This ENG1002 - Engineering Assignment has been solved by our Engineering experts at UniLearnO. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+ Students in Australia, UK & US by helping them to score HD in their academics. Our Experts are well trained to follow all marking rubrics & referencing style.
Be it a used or new solution, the quality of the work submitted by our assignment experts remains unhampered. You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turnitin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.

  • Uploaded By : Brett
  • Posted on : August 31st, 2019
  • Downloads : 281

Whatsapp Tap to ChatGet instant assistance