1. These days, the construction industry is making the transition from CAD to BIM. Please describe why our industry is so enthusiastic about implementing BIM,
considering unique features of BIM as opposed to 2D CAD drawing practices.

2. Suppose you are the head of a construction division at ‘the West Kowloon Cultural District Authority’, and are responsible for managing all on-going construction
projects in the district, one of the largest cultural projects in the world.

At the moment, multiple facilities are under construction simultaneously by different contractors. Recently, you are facing many issues as below:
 - As a client, your team needs to monitor construction progress of multiple projects. Contractors report their progress every week via an email. However, as they are
using different format of progress data, your team members are spending lots of time to collect all the information manually.

The construction procedures vary depending on contractors. To secure the quality of construction projects, you asked contractors to comply with existing government
project procedures, but they are complaining that the government project procedure is outdated and doesn’t fit the current on-going projects.

- A huge amount of the upfront endowment (HK$21.6 billion) was made by the Government of HKSAR for the design and construction of various facilities. However,
your team has a difficulty of monitoring expenses for each project. It seems that some of projects are experiencing cost-overrun.

- As the construction site is on reclaimed land, many unexpected issues during construction are being observed, such as sinkhole, leaks and flooding, which could
lead to significant safety accidents.

To solve these issues, you want to implement an IT system for better project management and control. Please suggest 1) one of IT systems that can be useful to
tackle these issues, 2) a strategy and process of adopting it, and 3) functions required in the system, considering the issues you have now.

3. From the contractor’s point of view, what kinds of information should a building model contain? If the architect uses BIM to design a building, what information
 needed by the contractor is NOT likely to be present?

4. What is an Internet of Things (IoT)? Please describe TWO of the application areas for smart cities, including background, types of IoT, potential benefits etc.

 

This Engineering Assignment has been solved by our Engineering experts at UniLearnO. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+ Students in Australia, UK & US by helping them to score HD in their academics. Our experts are well trained to follow all marking rubrics & referencing style.

Be it a used or new solution, the quality of the work submitted by our assignment experts remains unhampered. You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turnitin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.

Eureka! You've stumped our genius minds (for now)! This exciting new question has our experts buzzing with curiosity. We can't wait to craft a fresh solution just for you!

  • Uploaded By : Noah
  • Posted on : January 09th, 2019

Whatsapp Tap to ChatGet instant assistance